• Author:Schroeder, K.
  1. Real-time control of urban drainage systems allows activating capacities of storm water storage and wastewater treatment that were not used before. The historically developed structure of the Berlin combined sewerage, along with its aforementioned properties, allows per se a systematic management of the sub-systems. In the course of rehabilitation works the implementation of local regulators already opened additional storage reserves. Additionally, the potential of global control concepts for sewerage, pump stations and treatment plants is studied within the framework of the project “Integrated Sewage Management” to increase the systems efficiency. Especially, a coordination of the currently locally controlled pump stations entails a reduction of sewer overflows and hence an enhanced protection of the environment. For the catchment of wwtp Berlin-Ruhleben an integrated model of the collection system, pump stations, pressurised mains and the wwtp itself has been built up in order to evaluate different scenarios of global pump station control in comparison to a local control scenario (reference). Special attention was paid to the discharges from CSOs. Due to the high dynamic of these events and the high fraction of biodegradable organic substrate within the effluents, the impact on the water body over this path plays an important role. Concerning CSOs a maximum reduction of 14 % (COD load) and 20 % (TKN load) could be achieved. In conclusion it can be stated that a reduction of total emissions from the sewage system can be achieved by operating the pump stations in a global control mode. Furthermore, the main improvement can be observed for the discharges from combined sewer overflows.
  2. (2004): Bewertung von Strategien der Abflusssteuerung mittels Kanalnetzsimulation. p 27 In: 1. Berliner Wasserwerkstatt. Berlin. 2004-08-19
  3. Simulation tools help develop an integrated approach for Berlin’s combined sewage system in which sewage overflows pose risk to groundwater and surface water quality
  4. The paper introduces an algorithm for a level dependent real-time control of sewage pump stations and states results from its evaluation based on a spectrum of simulations for three different catchments of the Berlin drainage system. The objective of the control function is to smooth the delivery of the pumps towards the wastewater treatment plant during storm weather events by throttling the flow and implicitly activating inline retention capacities of the sewer networks. The article comprises the definition and functioning of the control concept as well as operational constraints and boundary conditions and the derivation of optimal control parameters. The simulation-based evaluation of the concept shows that it is possible to manage available inline storage volume by applying the control function. However, only if an adequate retention volume of around 50.0 m³/ha Aimp or more is available a significant improvement of the flow characteristic towards the wwtp is possible.
  5. (2004): Integrated Sewage Management - Development of a global Real Time Control for three interconnected Subcatchments of the Berlin Drainage System. p 8 In: Novatech 2004 - 5th international conference on sustainable techniques and strategies in urban water management 2004,. Lyon, France. 6. - 10.6.2004
    Due to the sensitive situation of watercourses in the urban area of Berlin the water authorities have set special conditions for discharge especially from combined sewer overflows. To meet the legal requirements a central task is to reduce the pollutant load discharged into receiving waters and for this purpose the intelligent utilisation of the available capacities of the entire waste water system. Measures of local real-time control have already been implemented in the Berlin drainage system. This paper is focusing on the potential of an additional superior global control concept. Comparative simulations for three interconnected subsystems are carried out to evaluate different operational alternatives.
  6. (2004): Simulationsgestützte Entwicklung von Strategien der Verbundsteuerung am Beispiel des Berliner Entwässerungssystems. p 9 In: 5. Hannoversche Software-Tage für die Wasserwirtschaft. Hannover. 30. - 31.03.2004
  7. (2004): Current State And Development Of The Real-Time Control Of The Berlin Sewage System. p 8 In: 4th World Water Congress. Marrakech, Marokko. 19. - 24.9.2004
    Since the 1970s we know about the idea of real-time control of urban drainage systems. Anyway, global real-time control strategies still show a lack of implementation for large drainage systems of high complexity. In Berlin, Germany, a city of 3.5 million inhabitants covering an area of around 900 km², the demand for enhanced protection of the environment and the growing economic pressure have led to an increasing application of control assets and concepts within the sewage system. In the framework of the project “Integrated Sewage Management” the possibilities of a global and integrated control strategy for the Berlin system are examined. The paper is focused on the historical concept and design of the sewerage and the further improvement towards an environment-oriented system that builds the basis for today’s considerations. The operational method and functionality of local regulators that have already been implemented are described. Further more the model-based methodology for the analysis of the system and the development of global control concepts as well as results of system analysis are stated. On the basis of model simulations it is shown that a global coordination of pump stations can lead to a reduction of sewer overflows and consequently to an enhanced water protection.
  8. (2003): Zustand und Entwicklung der Steuerung des Berliner Entwässerungssystems. p 6 In: ATV-DVWK and VDI/VDE Symposium “Mess- und Regelungstechnik in abwassertechnischen Anlagen”. Wuppertal, Germany. 25. - 26.11.2003
    Die Steuerung von Entwässerungssystemen erlaubt bislang ungenutzte Kapazitäten, sowohl zur Speicherung, wie auch zur Reinigung von Abwasser, zu aktivieren. Die historisch gewachsene Struktur der Berliner Mischkanalisation mit ihren oben aufgeführten Eigenschaften erlaubt per se eine gezielte Bewirtschaftung der Teilentwässerungssysteme. Im Zuge von Sanierungsarbeiten wurden mittels lokaler Steuerungsorgane bereits zusätzliche Speicherreserven in den Kanalnetzen erschlossen. Um die Effizienz des Systems weiter zu erhöhen, wird im Rahmen des Projektes „Integrated Sewage Management“ das Potenzial einer Verbundsteuerung von Kanalnetzen, Pumpwerken und Kläranlagen untersucht. Erste Ergebnisse bezüglich möglicher Effekte einer globalen Steuerung von vernetzten Systemkomponenten werden für Ende 2003 erwartet, wenn anhand des entwickelten Modells verschiedene, realisierbare Steuerungsstrategien simuliert und auf ihre Auswirkungen hin getestet und evaluiert werden. Bezüglich der Umsetzung von geplanten Strategien und der Entwicklung von ersten Applikationen für den Betrieb des Abwassersystems wird an dieser Stelle auf [Mannel, 2003] verwiesen.